FREE 1 to 3-Day Delivery on Orders $119+ Details
STEP 1 LOCATE PCV TUBE
STEP 2 REMOVE 90 DEGREE FITTING
STEP 3 REMOVE STRAIGHT FITTING OF PCV TUBE
STEP 4 REMOVE PCV TUBE
STEP 5 REMOVE STRUT TOWER NUT ON DRIVERS SIDE
STEP 6 ASSEMBLE TANK AS SHOWN APPLY TEFLON TAPE TO ALL FITTINGS
STEP 7 INSTALL ¼X20X1
STEP 8 INSTALL BILLET CLAMP
STEP 9 INSTALL STAINLESS BRACKET
STEP 10 INSTALL ASSEMBLY
STEP 11 ADJUST CLAMP TO BODY TO
APROX. 2”
STEP 12 CUT INSULATION FROM PCV TUBE
STEP 13 CUT STRAIGHT FITTING AND 90 DEGREE FITTINGS FROM PCV TUBE ASSEMBY
STEP 14 REMOVE REMAINING TUBE FROM FITTINGS
WHEN COMPLETE YOU WILL HAVE FITTINGS THAT LOOK LIKE ABOVE
STEP 15 CUT 1 PC OF HOSE AT 22” AND INSTALL ONE END AS SHOWN TO AIR OIL SEPARATOR
STEP 16 ROUTE HOSE AS SHOWN AND INSTALL90 DEGREE END INTO VALVE COVER
STEP 17 CUT 1 PC OF HOSE AT 11” AND INSTALL ONE END AS SHOWN TO
AIR OIL SEPARATOR
STEP 18 INSTALL STRAIGHT END FITTING INTO INTAKE
STEP 19 INSTALL DRAIN CAP AS SHOWN
STEP 20 VERIFY THAT BALL VALVE IS CLOSED