Installation Time
(approx) 2 Hours
Difficulty Level:
Light to Moderate mechanical skill required.
FREE 1 to 3-Day Delivery on Orders $119+ Details
$283.92
Saved - View your saved items
We're sorry. We couldn't save this product at this time.
or use
Features, Description, Reviews, Q&A, Specs & Installation
Brand | SP Performance |
Rotor Location | Front |
Rotor Type | Slotted |
Superior Stopping Power. If you’re not satisfied with the performance of your current rotors, then replace them with these SP Performance Front Diamond Slotted Rotors with Black Zinc Coating. With these front rotors, your car will be able to deliver excellent stopping performance. Featuring diamond slotted holes, these rotors allow your brake pad surface to stay cooler, resulting in reduced brake fade and a stronger bite.
Built with Cast Iron. These front rotors are built with cast iron, allowing them to exhibit exceptional strength and long-lasting durability. They are also coated with a black zinc finish to increase their protection against rust and corrosion.
Diamond Slotted Style. For impressive style and performance, these rotors are designed with a diamond slotted style. With this structure, heat and dust will be able to easily escape your braking surface, creating a more solid bite.
Direct Installation. Setting up these rotors offers a direct installation. Geared with the right tools and mechanical skills, you can easily mount these rotors to your car’s factory location points.
Backed by a Lifetime Warranty. To cover any defects in material and workmanship, these rotors are backed by a lifetime warranty. For more warranty information, please visit the official SP Performance website.
Application. The SP Performance Front Diamond Slotted Rotors with Black Zinc Coating fit 2006-2014 Chargers with Dual Piston Calipers; 2015-2017 Daytona, R/T, SE AWD, SXT AWD; 2018-2023 with Dual Piston Front Calipers.
Fitment:
SP Performance D53-023-BP
CA Residents: WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
Installation Info
Installation Time
(approx) 2 Hours
Difficulty Level:
Light to Moderate mechanical skill required.
What's in the Box